Short Lead Time for Cooling Tower Fill - Open Type Steel Cooling Tower – Cross Flow – SPL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for True Undercounter Refrigerator , Freon Evaporative Condenser , Side Stream Filtration , To acquire a consistent, profitable, and constant growth by getting a competitive advantage, and by continuously increasing the value added to our shareholders and our employee.
Short Lead Time for Cooling Tower Fill - Open Type Steel Cooling Tower – Cross Flow – SPL Detail:

■ High Performance Heat transfer Media.

■ High efficiency, energy saving and environmental protection

■ Compact shape, easy installation

■ Strong anti-corrosion ability, long service life.

■ Patented Clog free nozzle

■ Energy – saving and environmental – friendly heat exchange equipment

1

Material of Construction: Panels and Coil available in Galvanized, SS 304, SS 316, SS 316L.
Removable Panels (optional): To easily access the Coil and Internal components for cleaning.
Circulating Pump: Siemens /WEG Motor, Steady running, low noise, Large Capacity but low power.
Detachable Drift Eliminator: Non corrosive PVC, Exclusive design

Principle of Operation: Hot process water from the Load / system / process enters the water distribution system at the top of the cooling tower where it is distributed over the highly efficient fills or heat transfer media. The axial fans, located at the top of the unit, induce air from the side of the unit over the fills. The fills enhances the air flow, increases the heat transfer area between the process fluid and the air, and improves the convection heat transfer.

Inlet Louvers protects the tower from foreign particles being drawn into the unit. When the hot process water comes in contact with the cold air, the air heats up and part of the process water is evaporated which removes the heat from the remaining water. Cold water falls down in the basin below after which it returns to the system / load. The warm saturated air exits the tower from the top, before it passes through the drift eliminators, which traps water droplets from the air putting it back in the basin below.

Chemical Tyre
Steel Plant Polyfilm
Automobile Pharmaceutical
Mining Power Plant

 


Product detail pictures:

Short Lead Time for Cooling Tower Fill - Open Type Steel Cooling Tower – Cross Flow – SPL detail pictures


Related Product Guide:

To become the stage of realizing dreams of our employees! To build a happier, much more united and far more professional team! To reach a mutual profit of our clients, suppliers, the society and ourselves for Short Lead Time for Cooling Tower Fill - Open Type Steel Cooling Tower – Cross Flow – SPL, The product will supply to all over the world, such as: Paraguay, Sri Lanka, Kenya, We are fully aware of our customer's needs. We provide high quality products, competitive prices and the first class service. We would like to establish good business relationships as well as friendship with you in the near future.
  • This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
    5 Stars By Julia from Hamburg - 2018.09.21 11:01
    The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Clara from Swansea - 2017.10.25 15:53

    Related Products